This opportunity has closed.

Sports Performance Center Weight Room Refresh

Description

Oregon State University (“Owner”) is accepting sealed bids from Contractors for a public improvement project at Construction Contracts Administration, Oregon State University, 644 SW 13th Street, Corvallis, Oregon, until 2:00 PM local time, July 11, 2019 for the Sports Performance Center Weight Room Refresh located on the campus of Oregon State University, Corvallis, Oregon.

A mandatory Pre-Bid Conference and examination of the site and conditions will take place on July 3, 2019 at 1:00 PM local time. Bidders shall meet with the Owner's Representatives in the Front Lobby area of the Sports Performance Center at 2737 SW Ralph Miller Lane, Corvallis, OR 97331. Attendance will be documented through a sign-in sheet prepared by the Owner’s Representative. Prime bidders who arrive more than 5 minutes after start time of the meeting (as stated in the solicitation and by the Owner’s Authorized Representative’s watch) or after the discussion portion of the meeting (whichever comes first) shall not be permitted to sign in and will not be permitted to submit a bid on the project.

Bids will be due July 11, 2019 by 2:00 PM local time, at the Property Services Building, 644 SW 13th Street, Corvallis, Oregon.

Plans and specifications for this bid are available at the following website: https://bid.oregonstate.edu/

All bidders must comply with requirements of the prevailing wage law in ORS 279C.800 through ORS 279C.870. All bidders must be registered with the Construction Contractor's Board at the time of bid submission. No bid will be considered unless fully completed in the manner provid¬ed in the "Instructions to Bidders" upon the Bid Form provided. OSU encourages bids from Minority, Women, and Emerging Small Businesses. 

Attachments

Addendum

  • This Addendum is hereby issued to inform you of the following revisions and or clarifications to the above‐referenced ITB and/or the Contract Documents for the Project, to the extent they have been modified herein. Any conflict or inconsistency between this Addendum and the Solicitation Document or any previous addenda will be resolved in favor of this Addendum. Bids shall conform to this Addendum. Unless specifically changed by this Addendum, all other requirements, terms and conditions of the Solicitation Document and or Contract Documents, and any previous addenda, remain unchanged and can be modified only in writing by OSU.
  • PDF
  • This Addendum is hereby issued to inform you of the following revisions and or clarifications to the above‐referenced ITB and/or the Contract Documents for the Project, to the extent they have been modified herein. Any conflict or inconsistency between this Addendum and the Solicitation Document or any previous addenda will be resolved in favor of this Addendum. Bids shall conform to this Addendum. Unless specifically changed by this Addendum, all other requirements, terms and conditions of the Solicitation Document and or Contract Documents, and any previous addenda, remain unchanged and can be modified only in writing by OSU.
  • PDF
  • This Addendum is hereby issued to inform you of the following revisions and or clarifications to the above‐referenced ITB and/or the Contract Documents for the Project, to the extent they have been modified herein. Any conflict or inconsistency between this Addendum and the Solicitation Document or any previous addenda will be resolved in favor of this Addendum. Bids shall conform to this Addendum. Unless specifically changed by this Addendum, all other requirements, terms and conditions of the Solicitation Document and or Contract Documents, and any previous addenda, remain unchanged and can be modified only in writing by OSU.
  • PDF

AwardDocument

Details